|
|
|
|
|
|
|
|
- A
congested sewage works before treatment
|
- 3 days
after dosing with WT200 the effluent began to soften
|
- 2 weeks
after the first dose the solids have started to break down
|
- 7 weeks
after dosing with WT200 the works begins to operate as it should
|
|
|
|
|
- Sewage
maturation pond after one week of dosing
|
- The
organics start to break down after 2 weeks
|
- The
maturation pond after 6 weeks
|
- A vast
improvement can be seen after 12 weeks
|
|
|
|
|
- Congested
pump station distribution chamber
|
- The same
distribution chamber 3 months later after dosing
|
|
|