Microbiological products to resellers around the world at cost effective rates
  Reduce discharge penalties low pH high organic load House hold waste recycling operations High density fish farming Remove fats,oils and grease

See our products at work

 
 
 

       

Waste water ammonia reduction

Aquatic restoration

  • A congested sewage works before treatment
  • 3 days after dosing with WT200  the effluent began to soften
  • 2 weeks after the first dose the solids have started to break down
  • 7 weeks after dosing with WT200 the works begins to operate as it should

Bioremediation of petro chemical waste

Winter months waste treatment ammonia control

  • Sewage maturation pond after one week of dosing
  • The organics start to break down after 2 weeks
  • The maturation pond after 6 weeks
  • A vast improvement can be seen after 12 weeks

Realise great savings

Meat rendering facilities

 

 

  • Congested pump station distribution chamber
  • The same distribution chamber 3 months later after dosing

 

 

 

© Copyright 2003 BioExport. All rights reserved.

; font-family: Verdana"> © Copyright 2003 BioExport. All rights reserved.