![Waste water ammonia reduction](images/Small/Sewage%20effluent1.jpg) |
![](images/Small/Sewage%20eflluent2.jpg) |
![](images/Small/Sewage%20effluent3.jpg) |
![Aquatic restoration](images/Small/Sewage%20effluent4.jpg) |
- A
congested sewage works before treatment
|
- 3 days
after dosing with WT200 the effluent began to soften
|
- 2 weeks
after the first dose the solids have started to break down
|
- 7 weeks
after dosing with WT200 the works begins to operate as it should
|
![](images/Small/Congested%20retention%20dam1.jpg) |
![](images/Small/Congested%20retention%20dam2.jpg) |
![Bioremediation of petro chemical waste](images/Small/Congested%20retention%20dam3.jpg) |
![Winter months waste treatment ammonia control](images/Small/Congested%20retention%20dam4.jpg) |
- Sewage
maturation pond after one week of dosing
|
- The
organics start to break down after 2 weeks
|
- The
maturation pond after 6 weeks
|
- A vast
improvement can be seen after 12 weeks
|
![Realise great savings](images/Small/solid%20organic%20blocked%20drain.jpg) |
![Meat rendering facilities](images/Small/Organic%20digestion.jpg) |
|
|
- Congested
pump station distribution chamber
|
- The same
distribution chamber 3 months later after dosing
|
|
|